If you are carrying out an extension, you should be aware of the Party Wall Act. This often overlooked issue can add thousands of pounds to the cost of your project, and it is something that can sometimes be avoided depending on the design of your project.

The first thing you need to do if the party wall act applies to your work is to serve notice to you neighbour. There is some information below to help you learn more about the notices and which one may be applicable to your project. Party Walls Direct offer a great way to get free party wall notices generated instantly that can save you a few hundred pounds and get you party wall notices at no cost. If you know which party wall notice you require, you can follow the links below to get free notices.

Get a free Party Structure Notice

Get a free Line of Junction Notice

Get a free Adjacent Excavation Notice

Party Wall Advice

The Party Wall (etc) Act 1996 provides a framework for preventing or resolving disputes that relate to party walls (walls under ownership of two or more people), party structures, boundary walls, and for excavations carried out near to neighbouring buildings.

Where a person intends to carry out works covered under the Act, they must serve appropriate notice on the adjoining owners who are affected by the works.

Works that are covered by the Act include:

  • Various works to an existing party structure
  • New building at or astride the boundary line with another property
  • Excavations with 3m or 6m depending on the depth

Notices can be served by anyone, but are typically served by a Party Wall Surveyor. The notices must contain certain information in order for them to be deemed valid by the Act.

Once the notices are served upon your neighbours, they then have 14 days to either consent to the works or dissent. Note that if they do not respond to the notice within the 14 day period, they are automatically deemed to have dissented.

In the event that your neighbour dissents, then a Party Wall Award must be prepared. This document sets out how the works are to be carried out an includes various other details relating to the progress of the works, including drawings and method statements where appropriate.

The Party Wall Award will be agreed by the surveyor(s), signed and issued to the owners. From that point on, the words must proceed in accordance with the Award.

Failure to comply with the Party Wall Act can lead to your neighbour seeking a injunction to prevent you from carrying on with the works.

When is a Party Wall Notice required?

The Party Wall Act requires that notice is served upon your neighbours for only certain types of works. There are three types of notices, and these cover three primary types of works.The types of notice are:

  1. Party Structure Notice: covering works directly to the party wall or structure.
  2. Line of Junction Notice: covering new building on, or next to the boundary line.
  3. Adjacent Excavation Notice: covering excavations near to neighbouring property.

Building on the boundary line, and excavations

You are required to serve a Line of Junction Notice and Adjacent Excavation Notice at least 1 month before the works start. The works covered in these notices is quite self explanatory but there are a few points covered here:

  • Line of Junction Notice: If you are building on, or immediately adjacent to, the boundary line with another property, you must serve a Line of Junction Notice at least on month before you start the construct the wall.
  • 3m Adjacent Excavation Notice: If you are excavating, for any purpose, within 3m of a neighbouring property, AND to a depth greater than the neighbouring property’s foundations, you must serve an Adjacent Excavation Notice at least 1 month before the excavation starts.
  • 6m Adjacent Excavation Notice: If you are excavating, for any purpose, within 6m of a neighbour property, AND to a depth greater than the path formed by drawing a diagonal line at a 45 degree angle downwards from the base of the neighbouring property’s foundations, you must serve an Adjacent Excavation Notice at least 1 month before the excavation starts.

Works to a party wall

If you plan to do works covered by the Party Wall Act directly to a party wall or structure, then you must serve a Party Structure Notice at least 2 months before the works commence.

Works covered by a Party Structure Notice

  • Underpinning, thickening or raising a party structure.
  • Making good, repairing, demolishing or rebuilding a party structure.
  • Cutting into a party structure, for any purpose such as inserting flashings, beams etc.

There are many other circumstances where a Party Structure Notice may be required, and if you are at all in doubt you should speak to a party wall surveyor.